Near Completion
We have been working on the second floating TriPod base for a few months and we are finally nearing the completion of it. Our first TriPod base has been in the water for some time now so we are excited to get the second one finished.You can see in the video below that all of […]
SeaPod Kitchen Sliding Doors
The SeaPod will have a large set of sliding doors that will open up what is basically a wall of glass between the kitchen and the patio area to turn the kitchen/dining area into an open-air room. We wanted to find a way to implement this to truly open up the space and let you […]
Roof Disk Mold
We are back at the factory for a quick update from Grant about the progress of the EcoPod roof. This will be a functional roof in a few different ways so we are really excited about it. The team has been making quick progress and it is starting to take shape.The roof is going to […]
SeaPod Windows Complete!
When the SeaPod was originally designed, one of the things that Grant really pushed for was to have huge windows. One of the best things about living on the sea is having beautiful views, so without big windows to enjoy the views, what’s the point?It’s easy to say “Let’s have huge windows” and it is […]
Interior Frame of EcoPod is taking shape
The frame of the EcoPod is really coming along now. We have the top portions of the walls installed and now we can really see where the windows will be. This top wall section will be where the roof eventually will be mounted. The installation of the bottom section of the walls was successful so […]
Window Testing
Here at Ocean Builders we are always experimenting, testing, reiterating, and trying to do things better than before and find new ways to improve. We always know what we would like the outcome to be, so it is important to constantly do testing and experimenting to see if we are getting closer or further away […]
Inserting the Floor
The time has come for the floor to be installed in the first SeaPod prototype. As with many aspects of the journey that we have gone on to bring these homes to life, it wasn’t easy and it took some time, thinking, and muscle to make it happen.You can see in the video below that […]
Pod Admin Panel Updates (June)
Here we have a quick update on the Pod Admin Panel which is what the administrators will use to manage the computer and monitoring systems of each pod. This update shows a few things that we have been working on.The first part we have been polishing is the notification system. This will allow the admin […]
3DCoral Printer Unboxing and Assembly
One of the big ambitions that we have is the 3D printed coral project that we are working on. Our goal is to be eco-restorative as much as possible and since coral reefs are sort of like the Amazon of the sea, we knew it was going to be important to us to do our […]
Delivery Drone 10 – High Wind & Turbulence Stabilization and Testing
We are building our own delivery drone from the ground up so that means that we have to test everything as we go, there are no previous tests or a track record since we are custom building this drone.Since the SeaPods will be at sea, where there are usually steady or gusty winds, this drone […]
Turtle Key Beach Cleanup with Reef2Reef and PanaSea
Connor Firmender Environmental
Connor took us along on a beach cleanup that he recently went on with some of our partners, Reef2Reef and PanaSea. They took a boat to a small island here in Panama and spent the day cleaning up trash that has washed ashore over the years.You can see in the video below that the amount […]
Big Moves
We have some big moves happening here at the factory. The shell of the SeaPod prototype is assembled and reinforced and is now ready to be moved outside. We are moving it outside so that we can take the prototype of the EcoPod from our “front yard” to the inside of the factory where it […]
Shipping a SeaPod!
We are planting the SeaPod seed here in Panama, but our eventual goal is to have SeaPod homes in every corner of the ocean, all around the world. Now, that is much easier said than done, and it means we will have to ship homes our factory being located in Panama, at least at first.Eventually […]
Pod Watercraft and People Lifting Mechanism
This was an idea that we had for lifting small watercraft like a jet ski, paddleboard, kayak, or a small boat from the water level up to the level of the Pod. In addition to watercraft, it could be also used to lift people from the water to the Pod.This could have several uses like […]
Stair Cover Design
We have had a spiral staircase here at the factory for about a year and a half that we use to get to the second level of our offices. We wanted to build this staircase to the exact dimensions that we will be using in the spar of our homes so that we could test […]
We have contact!
We have a pretty big operation going on here at the factory as we move our EcoPod prototype from the yard at the factory to the floating TriPod base that is in the marina. We wanted to just do a test to see how everything would fit together before we add all of the weight […]
Surveying Locations for Deep Water SeaPod
Rüdiger Koch Other deep water seapod
One of the things that we are looking into is a Deep Water SeaPod. The first SeaPods will be in waters that are no more than 25 meters or about 80 feet of water, but we want to explore the option of going deeper. Rüdi went on a little expedition to explore a possible location […]
Minor Procedure on SeaPod
We built the SeaPod roof upside down so when it was finished, we had to get it flipped over. We called this process The Flippening and it was quite the feat. We didn’t want to put the weight of the roof directly onto the fiberglass roof material so we built a steel frame on the […]
Delivery Drone 9 – Locking on Target
We have made a few revisions to the precision landing system that will allow our drone to lock on to the landing area and land precisely on target every time. Our original plan was to use an infrared tag which the cameras on the drone would locate and then use to align the aircraft for […]
Finishing Production of The Last Roof Quarter
Grant Romundt Construction
We have been working on the EcoPod roof for the past few weeks and we are now finishing up production on the final section of the inner disk. The video below shows the process that the crew has to do to release each section from the mold.These 1.3cm fiberglass sections have an extremely tight fitment […]